Print Page | Contact Us | Sign In | Join GAWP
District 3 Meeting / Tour of Coweta Water Authority's B.T. Brown Water Treatment Plant
View Registrations Tell a Friend About This EventTell a Friend
 

Trenchless water distribution main rehabilitation Treatability study and pilot testing design and benefits

6/3/2015
When: Wednesday, June 3, 2015
10:00 AM until 12:00 PM
Where: B.T. Brown Water Treatment Plant
610 Lamar Smith Drive
Newnan, Georgia  30263
United States
Contact: Chuck Youmans
770-419-6447


Online registration is closed.
« Go to Upcoming Event List  

Trenchless Water Distribution Main Rehabilitation

Treatability Study and Pilot Testing Design and Benefits

 

by Tom Hayes, Murphy Pipeline (Trenchless Water Distribution Main Rehab)

and Frank Rombardo, Hazen and Sawyer (Treatability Study and Pilot

Testing Design and Benefits)

 

 A Tour of Coweta Water Authority's B.T. Brown Water Treatment Plant will follow the presentations

 - Reservations are required

-Limited to 60 people

- 2 re-certification points will be awarded

-Food not provided

Directions:

TRAVELING ON I-85, TAKE EXIT 51(GA 154) TURN WEST. TRAVEL WEST ON HIGHWAY 154 FOR APPROXIMATELY 0.7 MILES TO GA. 14/US 29. TURN LEFT ONTO HIGHWAY GA 14/ US 29 AND TRAVEL 1.8 MILES TO CEDAR CREEK ROAD. TURN RIGHT ONTO CEDAR CREEK ROAD AND TRAVEL 2.3 MILES TO HAPPY VALLEY CIRCLE. TURN RIGHT ONTO HAPPY VALLEY CIRCLE AND TRAVEL 0.6 MILE TO LAMAR SMITH ROAD. TURN RIGHT ON LAMAR SMITH ROAD AND TRAVEL 1 MILE. THE FACILITY IS ON THE RIGHT.

FROM DOWNTOWN NEWNAN, TAKE GA 14/ US 29 NORTH FOR 7 MILES TO CEDAR CREEK ROAD. TURN LEFT ONTO CEDAR CREEK ROAD AND TRAVEL 2.3 MILES TO HAPPY VALLEY CIRCLE. TURN RIGHT ONTO HAPPY VALLEY CIRCLE AND TRAVEL 0.6 MILE TO LAMAR SMITH ROAD. TURN RIGHT ON LAMAR SMITH ROAD AND TRAVEL 1 MILE. THE FACILITY IS ON THE RIGHT.